AIGA Design Archives

This text-only record is part of the interactive AIGA Design Archives where you can view more details, zoom into images and explore other works in the definitive online resource on American design.

Design Category
Information design, 1995
Design firm
The New York Times (New York, New York)
Collection
(1996) Information Graphics: Design of Understanding

Description

During New York City’s fiscal crisis, the Manhattan Bridge suffered a lack of maintenance and repairs. By the end of 1990, two sets of subway tracks were shut down to avoid overtaxing the weakened structure, which was inspected inch by inch over the following summer. The designer obtained the Department of Transportation log and sorted detailed locations of the corroded and cracked areas. By stacking the total number of dangerous “spots” over each roadway panel, the resulting diagram conveyed the location of the worst damage, emphasizing the cumulative number of problems by the degree of vertical stacking. The diagram was completed in July 1992, just as inspectors found a hole in a support beam which forced a shutdown of the entire bridge.

Credits
Designer: Anne Cronin
Publisher/client: The New York Times